“Andrew came out on a Saturday, walked the yard with the cats, quoted it honestly, and built the thing inside two weeks. The screen is taut. The cedar already looks like it has been here forever.”
A 120-square-foot screened enclosure off the rear deck — cedar frame, marine-grade screen, a tongue-and-groove ceiling, and an existing door cut to a flap the cats use on their own schedule.
The first job Revenant carried from inquiry to invoice under the Phase 1 license. Quoted on a Saturday walk-through; framed and standing inside two weeks.
A pre-LLC project from spring 2025. Photo bank has the finished work; the scope memo, address, and duration will be filed once Andrew curates the project record.
Pre-LLC. Captured across May 2024 — framing, weather-in, and finished elevation. The project is on the photo bank shortlist and will be curated for the next site update.
Pre-LLC finish-carpentry work — built-ins, mantel, and trim. Photographed at handoff. Caption copy will follow Andrew’s curation pass.
“Andrew came out on a Saturday, walked the yard with the cats, quoted it honestly, and built the thing inside two weeks. The screen is taut. The cedar already looks like it has been here forever.”